On Saturday, 23 June 2018 the new production facility of BRÜCKNER, the world market leader in dry finishing machines for textiles and technical textiles, was officially opened in Tittmoning, Bavaria. Representatives from politics, the church, banks and industry were present when Regina Brückner inaugurated the new, generously dimensioned production plant together with Dr. Peter Ramsauer, former Minister of Transport and approx. 800 other guests.
"Our old factory simply became
too small. Increased incoming orders and ever-increasing demands on machine
sizes and delivery dates were the reason for planning a new plant in 2014. We
were not able to start construction until November 2016, as many hurdles in the
approval process and with regard to nature conservation had to be overcome in
advance. With the new plant with 25,000 m² of production space and a spacious
office wing, we will continue to meet the high expectations of our customers in
the future. The possibility of producing components with a height of up to 12 m
and a working width of up to 8.80 m offers us great potential for the future.
Our employees are also pleased about the new, more spacious workplaces, more
effective logistics and more powerful lifting gear. With a large number of new,
highly automated processing machines, we are in a position to manufacture and
supply even larger machines as before, and we will also be able to increase our
delivery volume and significantly shorten delivery times," emphasized
Regina Brückner in her address.
In her speech, she explained the
many advantages of the new plant and presented details of the highly automated
and efficiently organized production: the new modern CNC machine tools, the
additional welding robots and the new highlight of the plant: the highly
automated powder coating and wet coating system. She emphasized that the
installation and commissioning times can be further reduced thanks to the
significantly improved lifting, transport and assembly options. The now
ceremonially opened new plant in Tittmoning is another forward-looking step of
BRÜCKNER to reposition itself in the world market for the finishing of textiles
and technical textiles as a system supplier with great future potential.
The former German Minister Dr. Peter
Ramsauer emphasized in his speech the importance of the manufacturing industry
in Germany and expressed his joy that BRÜCKNER, the leading manufacturer of
textile machines, is so clearly committed to the location Germany and does not
transfer jobs abroad. He congratulated BRÜCKNER on the successful move to the
new plant and emphasized the outstanding importance of such tradition-conscious
family companies as BRÜCKNER for the German industry and the location Bavaria
in particular. He once again emphasized the considerable investment of 40
million at BRÜCKNER's long-term production site in Tittmoning and expressed his
pleasure that great importance was attached to a sustainable and
environmentally friendly implementation already during the planning phase.
The celebrations were preceded by a
BRÜCKNER agency conference in which more than 90 Brückner representatives
worldwide were informed and trained about new technical developments.
Representatives from industry, trade, banks and politics as well as invited
planners, architects, neighbours and staff members focused on the new plant for
a total of four days. Executing companies and local residents as well as many
of the numerous employees present will be pleased when "calm has
returned" and BRÜCKNER can concentrate again on the essential: the
production of textile machines of the highest quality "made in
Germany".
The property, complete with 30-seat screening from room, a 100-seat amphitheater and a swimming pond with sandy shower…
The property, complete with 30-seat screening from room, a 100-seat amphitheater and a swimming pond with sandy shower…
The property, complete with 30-seat screening from room, a 100-seat amphitheater and a swimming pond with sandy shower…
The property, complete with 30-seat screening from room, a 100-seat amphitheater and a swimming pond with sandy shower…
The property, complete with 30-seat screening from room, a 100-seat amphitheater and a swimming pond with sandy shower…
We’ve invested every aspect of how we serve our users over the past Pellentesque rutrum ante in nulla suscipit, vel posuere leo tristique.
We’ve invested every aspect of how we serve our users over the past Pellentesque rutrum ante in nulla suscipit, vel posuere leo tristique.
We’ve invested every aspect of how we serve our users over the past Pellentesque rutrum ante in nulla suscipit, vel posuere leo tristique.
We’ve invested every aspect of how we serve our users over the past Pellentesque rutrum ante in nulla suscipit, vel posuere leo tristique.